Pre-Cleaning Tower building - Factory 1
06-07-2015
|
Reinforcement structures for grain silo
|
Building for the Geho Pump
|
Raft and HDPE pipings
|
Installing 2 tanks for industrial water
|
Assembling equipment and pipes
|
Casing boreholes and laying pipes
|
Maintenance Work: Pirites Alentejanas
|
20 m³ to 200 m³ tanks
|
Casing boreholes: Pirites Alentejanas
|
Casing boreholes: Somincor
|
Supplying Drinking Water
|
Paste Piping
|
Maintenance Work: Tagol/Sovena
|
Erecting SSP 70 T/D
|
SSP 70 T/D building
|
Contract for Installation of Lines 6 and 7 - Polymer
|
Erecting Building for Lines 6 and 7 - Polymer.
|
Maintenance Work: Sovena
|
Expansion of Granulation Building - Factory 1
|
Biodiesel Line - Loading Ships
|
Dock work: SETH
|
Legemachine 1
|
Maintenance Work: Hutchinson
|
Seawater Cooling System
|
Complement to Lines 6 and 7 of Polymer
|
Erecting 2 Spinning mills and 2 Wire drawing stations
|
Dismantling 2 Spinning Mills and 3 Wire drawing stations
|
Bottle Polymer Building: Habipax
|
Expansion of Spinning Mill: Habipax
|
Expansion of the Polymer Factory for Bottles
|
Assembling 2 sheet metal cutting lines
|
Protecting Press pits
|
Fire Network: Soporcel
|
Fire Network: Ford
|
Fire Network: Renault
|
Miscellaneous repairs and maintenance
|
New Paper Machine
|
Bulkhead to sieve
Fevereiro 2016
|
Extraction Cyclone
Fevereiro 2016
|
Access platforms to equipment in the zinc washing process
Fevereiro 2016
|
waste collection container for IBW's (Industrials Banal Waste)
2012
|
Stainless platforms for rafts
Fevereiro 2016
|
Building Coverage
Fevereiro 2016
|
8'',12'' and 16'' little cars
|
metal frame for storage of paints
Fevereiro 2016
|
Redler Manufacture of seed loading station bulk ship .
Fevereiro 2016
|
Support for engine and shaker
Maio 2016
|
Roller support for belt conveyor
Maio 2016
|
Suction pipes and compressor air extraction
Maio 2016
|
Mounting of a Grain Clean Machine
|
Mounting extraction towers and cooling pipe
2011
|
Prefabrication and assembly of double coil in brightener
2013
|
Support manufacturing for charging lanterns
2006
|
Laminator mounting
2010
|
Manufacture and assembly of grain husking system.
2010
|
Manufacturing and mounting of porch for the load suspension Winch
|
Repairing the Coil at the Brightener
2005
|
Manufacturing and mounting the Saving and Transport systems of polymers and flakes for the "filme" lines
2012
|
Manufacturing and installation of the water support line for the exploration fronts at the Mine
2011
|
Manufacturing and Mounting the system os pre-treatment and cleaning of the cereal on the preparation entrance
2011
|
Vertical Cooker Installation
2012
|
Pré-fabrico e Instalação de tubagens na Mina
2013
|
Reconversão do sistema das bombas de vácuo
2013
|
Fabricação de baileus com comandos para adaptação em Multifunções Telescópicos
2012
|
Reparações no cozedor vertical - verificação de sistemas de vapor e porta de visitas
2012
|
Construção do edifício para futura instalação do cozedor vertical
2016
|
Pré-fabrico e Instalação do Sistema de Tubagens de vapor do Cozedor Vertical.
2016
|
Pré-fabrico e Montagem do Cozedor Vertical
2016
|
Montagem dos tanques de hexano subterrâneos, respetiva tubagem e ancoramento dos mesmos
2013
|
Our services are in a position to be able to match any achievements in the fields of engineering, with long practice in plants linked to the paper industry, steel, chemicals, cement and mining.
Rua da Produção, Lote 599 Vila Amélia 2950-805 Quinta do Anjo |
Telefone: 212 260 060/3 (Call cost to national fixed network) Fax: 212 260 069 E-mail: geral@clarcon.pt |