Pre-Cleaning Tower building - Factory 1
06-07-2015
|
|
Reinforcement structures for grain silo
|
|
Building for the Geho Pump
|
|
Raft and HDPE pipings
|
|
Installing 2 tanks for industrial water
|
|
Assembling equipment and pipes
|
|
Casing boreholes and laying pipes
|
|
Maintenance Work: Pirites Alentejanas
|
|
20 m³ to 200 m³ tanks
|
|
Casing boreholes: Pirites Alentejanas
|
|
Casing boreholes: Somincor
|
|
Supplying Drinking Water
|
|
Paste Piping
|
|
Maintenance Work: Tagol/Sovena
|
|
Erecting SSP 70 T/D
|
|
SSP 70 T/D building
|
|
Contract for Installation of Lines 6 and 7 - Polymer
|
|
Erecting Building for Lines 6 and 7 - Polymer.
|
|
Maintenance Work: Sovena
|
|
Expansion of Granulation Building - Factory 1
|
|
Biodiesel Line - Loading Ships
|
|
Dock work: SETH
|
|
Legemachine 1
|
|
Maintenance Work: Hutchinson
|
|
Seawater Cooling System
|
|
Complement to Lines 6 and 7 of Polymer
|
|
Erecting 2 Spinning mills and 2 Wire drawing stations
|
|
Dismantling 2 Spinning Mills and 3 Wire drawing stations
|
|
Bottle Polymer Building: Habipax
|
|
Expansion of Spinning Mill: Habipax
|
|
Expansion of the Polymer Factory for Bottles
|
|
Assembling 2 sheet metal cutting lines
|
|
Protecting Press pits
|
|
Fire Network: Soporcel
|
|
Fire Network: Ford
|
|
Fire Network: Renault
|
|
Miscellaneous repairs and maintenance
|
|
New Paper Machine
|
|
Bulkhead to sieve
Fevereiro 2016
|
|
Extraction Cyclone
Fevereiro 2016
|
|
Access platforms to equipment in the zinc washing process
Fevereiro 2016
|
|
waste collection container for IBW's (Industrials Banal Waste)
2012
|
|
Stainless platforms for rafts
Fevereiro 2016
|
|
Building Coverage
Fevereiro 2016
|
|
8'',12'' and 16'' little cars
|
|
metal frame for storage of paints
Fevereiro 2016
|
|
Redler Manufacture of seed loading station bulk ship .
Fevereiro 2016
|
|
Support for engine and shaker
Maio 2016
|
|
Roller support for belt conveyor
Maio 2016
|
|
Suction pipes and compressor air extraction
Maio 2016
|
|
Mounting of a Grain Clean Machine
|
|
Mounting extraction towers and cooling pipe
2011
|
|
Prefabrication and assembly of double coil in brightener
2013
|
|
Support manufacturing for charging lanterns
2006
|
|
Laminator mounting
2010
|
|
Manufacture and assembly of grain husking system.
2010
|
|
Manufacturing and mounting of porch for the load suspension Winch
|
|
Repairing the Coil at the Brightener
2005
|
|
Manufacturing and mounting the Saving and Transport systems of polymers and flakes for the "filme" lines
2012
|
|
Manufacturing and installation of the water support line for the exploration fronts at the Mine
2011
|
|
Manufacturing and Mounting the system os pre-treatment and cleaning of the cereal on the preparation entrance
2011
|
|
Vertical Cooker Installation
2012
|
|
Pré-fabrico e Instalação de tubagens na Mina
2013
|
|
Reconversão do sistema das bombas de vácuo
2013
|
|
Fabricação de baileus com comandos para adaptação em Multifunções Telescópicos
2012
|
|
Reparações no cozedor vertical - verificação de sistemas de vapor e porta de visitas
2012
|
|
Construção do edifício para futura instalação do cozedor vertical
2016
|
|
Pré-fabrico e Instalação do Sistema de Tubagens de vapor do Cozedor Vertical.
2016
|
|
Pré-fabrico e Montagem do Cozedor Vertical
2016
|
|
Montagem dos tanques de hexano subterrâneos, respetiva tubagem e ancoramento dos mesmos
2013
|
Our services are in a position to be able to match any achievements in the fields of engineering, with long practice in plants linked to the paper industry, steel, chemicals, cement and mining.
| Rua da Produção, Lote 599 Vila Amélia 2950-805 Quinta do Anjo |
Telefone: 212 260 060/3 (Call cost to national fixed network) Fax: 212 260 069 E-mail: geral@clarcon.pt |