Pre-Cleaning Tower building - Factory 1
Supplying and installing metal structures and covering plates.
CUSTOMER: Sovena Oliseeds, S.A.
Reinforcement structures for grain silo
Designing, supplying and erecting metal structures for structural reinforcement to protect the Silo.
CUSTOMER: Sovena Oliseeds, S.A.
Building for the Geho Pump
Supplying and erecting metal structures, covering plates and building work.
CUSTOMER: Somincor
Raft and HDPE pipings
Supplying and assembling raft for dam. Supplying and installing HDPE pipes for connections (for the rejected).
CUSTOMER: Somincor
Installing 2 tanks for industrial water
Structure and building project (reservoir base and plinth support for pipes). Modifying/Changing 2 Thickeners for water reservoirs.
CUSTOMER: Somincor
Assembling equipment and pipes
Assembling equipment (Tumble Dryer). Assembling service pipes. Electricity and Instrumentation.
CUSTOMER: Filekemp
Casing boreholes and laying pipes
Casing boreholes, laying pipes for paste, water, etc., inside the mine.
CUSTOMER: Matsa
Maintenance Work: Pirites Alentejanas
Miscellaneous work for start of production.
CUSTOMER: Pirites Alentejanas, S.A.
20 m³ to 200 m³ tanks
Supplying and installing several tanks: Water for fire, Water Treatment; mixers.
CUSTOMER: Pirites Alentejanas, S.A.
Casing boreholes: Pirites Alentejanas
Casing boreholes for transporting water, air, fuel, etc.
CUSTOMER: Pirites Alentejanas, S.A.
Casing boreholes: Somincor
Laying pipes for casing boreholes from the surface to the interior of the mine
CUSTOMER: Somincor
Supplying Drinking Water
Supplying and laying pipes at the bottom of the mine.
CUSTOMER: Somincor
Paste Piping
Laying pipes at the bottom of the mine
CUSTOMER: Somincor
Maintenance Work: Tagol/Sovena
Miscellaneous maintenance work. (Performed in âstopsâ)
CUSTOMER: Sovena Oliseeds, S.A.
Erecting SSP 70 T/D
Assembling equipment, Piping, Electricity and Instrumentation.
CUSTOMER: Artenius
SSP 70 T/D building
Manufacturing and erecting metal structures. Building work.
CUSTOMER: Artenius
Contract for Installation of Lines 6 and 7 - Polymer
Assembling equipment, Pipes, Insulation, Electricity and Instrumentation.
CUSTOMER: Trevira Fibras, S.A.
Erecting Building for Lines 6 and 7 - Polymer.
General Contractor. Supplying and erecting metal structures. Building work.
CUSTOMER: Trevira Fibras, S.A.
Maintenance Work: Sovena
Conservation work and miscellaneous repairs. (Performed in âshutdownsâ)
CUSTOMER: Sovena Oliseeds, S.A.
Expansion of Granulation Building - Factory 1
Supplying and installing metal structures and covering plates.
CUSTOMER: Sovena Oliseeds, S.A.
Biodiesel Line - Loading Ships
Supplying and installing pipes and supports
CUSTOMER: Sovena Oliseeds, S.A.
Dock work: SETH
Dismantling and laying pier pipes
CUSTOMER: SETH
Legemachine 1
Equipment assembly
CUSTOMER: Johnson Controls, S.A.
Maintenance Work: Hutchinson
Assembling equipment, Pipes, Insulation, Electricity and Instrumentation.
CUSTOMER: Hutchinson Borrachas de Portalegre, Soc. Unip. Lda.
Seawater Cooling System
Manufacturing and laying pipes
CUSTOMER: Sovena Oliseeds, S.A.
Complement to Lines 6 and 7 of Polymer
Assembling equipment, Pipes, Insulation, Electricity and Instrumentation.
CUSTOMER: Trevira Fibras, S.A.
Erecting 2 Spinning mills and 2 Wire drawing stations
Assembling equipment, Pipes, Insulation, Electricity and Instrumentation.
CUSTOMER: Trevira Fibras, S.A.
Dismantling 2 Spinning Mills and 3 Wire drawing stations
Dismantling equipment and pipes.
CUSTOMER: Trevira Fibras, S.A.
Bottle Polymer Building: Habipax
Supplying and erecting metal structures and roofing plates.
CUSTOMER: Habipax
Expansion of Spinning Mill: Habipax
Supplying and erecting metal structures and roofing plates.
CUSTOMER: Habipax
Expansion of the Polymer Factory for Bottles
Supplying and erecting metal structures, covering plates and building work.
CUSTOMER: Hoeschst Fibras, S.A.
Assembling 2 sheet metal cutting lines
Installing mechanical and electrical equipment
CUSTOMER: Cosider, S.A.